excl. VAT
Article no.: GFPV00008

192 x 192 cm Greenhouse, 6 mm twin-wall sheets, no extras

ECO-STAR 3Standard
  • sturdy aluminium frame
  • long-life polycarbonate sheets
  • easy installation
  • 15-year guarantee on the aluminium frame
  • 10-year guarantee on the twin-wall panels
Select a special offer set:
Select the thickness of the twin-wall sheets:
Calculate delivery costs now
Free Mainland delivery
£639.00incl. 20% VAT
available immediately
Special stock, approx. delivery time: 3 - 4 weeks for mainland delivery.
Sale: -10%
gfp10
10 %
Buying tips and enquiries

The ECO-STAR 3 model by GFP allows plenty of daylight into the aluminium greenhouse thanks to translucent, approx. 6 or 8 mm thick polycarbonate twin-wall sheets.

  • sturdy aluminium frame
  • long-life polycarbonate sheets made in Germany
  • with ca. 6 or 8 mm thick, UV-resistant polycarbonate sheets
  • hinged door & single skylight
Width192 cm
Depth192 cm
Height at apex193 cm
Eaves height135 cm
Hinged door61 x 165 cm
Skylight1
Number of boxes2
Longest side of packaging185 cm
Total weight39 kg

Roof

The polycarbonate sheet roof is durable, UV-resistant & extremely robust - perfect for year-round use!
Here's what makes the polycarbonate roof stand out:
  • refracts light without burning glass effect
  • exhibits good thermal insulation
  • easier to install than glass
  • sheets are made in Germany
Specifications:
  • ca. 6 mm thick polycarbonate twin-wall sheets
  • 10-year guarantee on the twin-wall panels (See the guarantee)
* Product may differ in size and colour from the image.

Skylight

Hinged door

Aluminium frame

  • assembly with 2 people
hqdefault
hqdefaultStep 1 Assembling the frontwall
hqdefaultStep 2 Assembling the rear wall
hqdefaultStep 3 Assembling the longitudinal parts
hqdefaultStep 4 Assembly of the Sidewall and roof struts
hqdefaultStep 5 Assembling the wind braces
hqdefaultStep 6 Glazing the greenhouse
hqdefaultStep 7 Assembling the window
hqdefaultStep 8 Assembling the door
hqdefaultStep 9 Final work

Free mainland delivery to the kerbside

Your advantages:

  • Save on delivery costs
  • No minimum order value
GWH_CUST_STA_1
GWH_CUST_STA_2
GWH_CUST_STA_3
GWH_CUST_STA_4
GWH_CUST_STA_5
GWH_CUST_STA_6
GWH_CUST_STA_7

How long is the delivery time?

The greenhouses are delivered from Eferding (Austria) within the stated delivery time. In rare cases, there may be delays in the shipping time, of which you will be informed.

Is the delivery made by a shipping company or via courier service?

What to do when the goods arrive?

What to do if the goods are damaged?

Are orders from abroad accepted?

Allow sufficient time for the set-up

To ensure that everything is stable and correctly assembled, you should allow enough time for the assembly of your greenhouse. In principle, you can assemble the greenhouse in one day, provided that you follow the assembly instructions consistently.

Get started with assembly in the morning

Ask friends and relatives for support

Sort all the parts in advance

Read the instructions carefully

Keep all important tools handy

Reviews

Safety instructions

In order for your greenhouse to withstand wind and weather and to protect your plants from the elements, a foundation is essential. The foundation serves as a load-bearing base and thus ensures a firm and secure stand. The foundation also ensures your greenhouse a long life. Common foundations for greenhouses are: strip foundation made of concrete, concrete slabs or prefabricated concrete blocks, point foundation made of concrete, and the laying of concrete slabs.